feat(process): add reactive capture scenarios

This commit is contained in:
morluto
2026-07-23 07:08:47 +00:00
parent 9df3fc4bbc
commit 69761e95b6
23 changed files with 1940 additions and 112 deletions
+31
View File
@@ -115,6 +115,37 @@ redacted from recorded text. The command-shim directory is placed first in the
captured process `PATH`; any remaining `PATH` must be explicitly supplied or
inherited under operator policy.
## Reactive process scenarios
Set `reactive` to a Process Reactive Scenario v1 declaration when interaction
must follow observed output instead of guessed delays. The graph declares an
initial state, absolute scenario and state deadlines, explicitly prioritized
transitions, bounded uses and visits, trigger predicates, ordered actions, and
either a next state or `passed` outcome.
The admitted runtime slice matches decoded UTF-8 terminal literals and exact
`terminal_raw`, `interaction`, `process`, `filesystem`, `http`, `websocket`, or
`shim` journal events. Process events are sampled observations, not an
event-complete lifecycle. Filesystem events identify named checkpoints; shim
events identify a command and route. Live predicates receive the same normalized
and redacted payload later persisted in Evidence. Predicates may compose with
bounded `all`, `any`, `sequence`, and `repeat` nodes and may select a frontier at
scenario start, state entry, a prior checkpoint, or an exact event ID. Actions
can write PTY input, resize it, signal the root process, or capture a named
filesystem checkpoint. `terminal_rendered`, `lifecycle`, and `replay_transition`
event triggers and non-root signal selectors fail during preflight before the
target launches.
Reactive results are recorded in `reactive_run`, including the terminal outcome,
active state, matched event IDs, action evidence IDs, and deterministic
transition journal. Terminal controls also commit the last admitted observation
order, so later output cannot be moved ahead of a timeout, cancellation, or
target loss during validation. If the process exits before the graph finishes,
the outcome is `target_lost`; state/scenario deadlines remain distinct
`predicate_timeout`/`scenario_deadline` outcomes. Timed `events` remain
available for fixed schedules, but they are not silently translated into the
reactive graph.
## Checkpoints and deterministic shims
Checkpoint triggers may use an elapsed time, a terminal literal and occurrence