* fix(javascript): exclude TypeScript this annotations from runtime parameters
* test(javascript): assert exact typed argument bindings
* test(apple): keep dyld slice regression portable
* fix(process): report no remaining time after a provider deadline fires
Node timers can fire while performance.now() is still a fraction of a
millisecond short of the monotonic deadline. ProviderStartupDeadline then
reported interruption "timeout" and an aborted signal while remainingMs()
returned ceil(0.x) = 1, so polling loops guarded by remainingMs() > 0
(Hopper and Ghidra startup) could run past an elapsed deadline, and the
real-timer test "aborts a bounded wait when its real monotonic deadline
expires" failed intermittently in CI (expected 1 to be 0).
Once the deadline's own timer has classified a timeout, report zero
remaining time. A deterministic regression test fires the timer with the
monotonic clock 0.4 ms short of the deadline.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
* fix(ci): restore descriptor and fixture validation
* test(ci): retain verification coverage within lint limits
* fix(test): share admitted Ghidra profile installation fixtures
* fix(ci): isolate timing report fixtures from workflow state
---------
Co-authored-by: hhang <169027046+xu91102@users.noreply.github.com>
Co-authored-by: Kaoru0822 <208281322+kaoru0822-kitauji@users.noreply.github.com>
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
Co-authored-by: morluto <76467478+morluto@users.noreply.github.com>
* perf(ci): start source feedback early and diagnose stalled runs
* fix(ci): verify workflow identities before main comparison limits
* fix(ci): preserve diagnostics across passing checks and install failures
* fix(ci): preserve ambiguous workflow run ordering
* fix(ci): preserve failure-report candidate and request budgets
* fix(ci): retain candidate errors while checking later main evidence
* fix(ci): retain partial reports and require complete health scans
* test(ci): prune stale fixtures and duplicated assumptions
* fix(ci): skip portable report merge when shards are skipped
The portable consumer can still run after an upstream build failure, even though the test-shard matrix is skipped and no Vitest blob artifacts exist. Guard artifact download and both report merge variants on successful shards; retain the required-shard gate so skipped or failed shards remain failures.
This applies the report-consumer condition from ee0256c740c9be18baae6c56d90285df8069f5b4 to current pinned main without changing action pins or required gates.
* fix(ci): preserve failed shard diagnostics
* docs: clarify current revision CI policy
Scope main pushes from a successful ancestor so canceled runs cannot hide changes. Keep the complete portable suite in fast feedback and move coverage plus Intel macOS to hourly, manual, explicit-full, and release qualification. Let qualification finish independently of superseded feedback.
Bind publication to full qualification at its exact revision and publish the verified tarball after checking workflow identity, version, and SHA-256. Keep trusted cache writers and reject incomplete merged test inventories.
Validation: 151 focused CI tests; typecheck/lint; actionlint 1.7.7; knip; all 1044 files discovered; bounded blob/merge smoke; macOS package verifier with retention and cleanup; npm pack dry run. Native Linux/ARM/Windows and remote workflow execution remain CI verification.
Run the existing README consistency and Python producer guards from their
CI owners. Execute full local validation fresh while preserving cached
preparation, and permit scoped reuse of earlier portable build entries.
Collect failed-shard diagnostics before enforcing success and publish
compact, portable timing history only after a complete successful merge.
Preserve installer truncation failure across supported Bash versions.
Keep cancellation tests focused on the called MCP tool, observe server
progress before timing target readiness, and retain delayed-startup,
cancellation, cleanup, and live follow-up request assertions.
Validation: all 32 CI jobs and the separate Go lane passed; 935 files,
9,630 cases, 9,544 passed, 86 skipped, zero failed. Controlled regressions
and fault/restoration probes are recorded in PR #2210.
Refs #2190.
Assisted-by: Kogasa (gensokyo-skills:kogasa-surprise-testing)